Be aware of multiple construction operations taking place throughout the construction corridor. Expected completion date is to be determined at a future date. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. A WIDTH RESTRICTION of Twelve Feet (12') is in place. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. Motorists can expect a one lane closure with pilot car. Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475 Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938 NMDOT Project Manager- Brian Torres 57. ![]() Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving. Construction Project Manager (915)316-7732 James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667 Post Date: 14:35:30.0 Update Date: 12:25:03.0 Expiration Date: unknown Patrick Palomarez, NMDOT Project Manager (505)288-1911 Contractor Hector Sicre, Constructor's Inc. Project is scheduled to be finished in Fall of 2023. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Motorists should obey all construction signing and watch for construction personnel and equipment. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website. Motorists can expect delays during this time.Ärivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. The contractor will be working Monday through Friday from 7:00 a.m. There will be an 11-foot width restriction in place as well. Starting May 1, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. This project will consist of full-depth reclamation, removal of existing asphalt, placement of new asphalt pavement, safety enhancements, traffic control, signing and striping. 550 between mile markers 161 and 165 in Aztec N.M. will begin a roadway improvement project on U.S. ![]() Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) and Fisher Sand & Gravel Inc. Title: Lane Closure, US 550 northbound and southbound from mile marker 160, Aztec to mile marker 165, 1 mile south of Inca. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475 Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938 NMDOT Project Manager- Juan Salas 57 Post Date: 08:38:54.0 Update Date: 12:03:57.0 Expiration Date: unknown ![]() Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |